2016 e4 - Build Plan?

You can send it to me, unless @Inwo has the extra time or want to check anything else.

I will PM you the address:

1 Like

I just thought of it too. Using the original contactor will need to be set to 48v.

I happen to have an extra orange 72v 400amp contactor sitting around. Just throwing it out there… Better to change the contactor or the settings on the controller?

Better for us to change and keep the programs standard.
Easier for you to not change it.
I plan to use the 48v in mine. It’s a simple line of programming.

Jumping on this, i was quietly following it. I’m back to my home and almost ready to start.

I was planing to use a new contractor for my 25s battery but I just saw here that the sevcon can be programmed to use the 48v one? Maybe I got it wrong

Yes, but it needs to be programmed to correct voltage. Nice thing is that it has two settings.
Pull-in and hold. A dc coil will hold in at half voltage so setting it at say, 3/4 will keep coil cool.
Sevcon will not work with special economizer coils, as it’s built in.
Either of us can change it. Or anyone with a programmer.

Is this a high voltage conversion of a new Gem?
Are you aware of the rewiring needed? I don’t know where we left off.
We have not been using the Gem vcm or can. The throttle and direction signals need to be hard wired to the new sevcon.

I don’t want to use Earnie’s post to go deep into my build but yes, I’ll convert my 2016 to a high voltage, I’ve got the Sevcon and motor from you guys. You also sent me a board to plug and play but it will be for old gems. Wondering if you have something similar for 2016+… Also got a quiet transmission from Rodney that I’m planing to test too. (Like the one @MikeKC has right now)

I’ve bought a hv solenoid.
I didn’t get to the of the wiring yet. I remember you told me the Throttle was going to be hard wired and not sure what else. I was planing to ask you when I reach that part.

1 Like

That stackable tray fits like a glove!

2 Likes